Iris Vale
Iris Vale
Product manager
Experimentation
Forty tests a quarter
How a small team learned to ship experiments without a growth team.
Published Jun 2, 20262 min readExperimentation

When I joined Relay we shipped every week and tested nothing. When I left we ran forty experiments a quarter. This is how a team of nine got there without a growth team.
Start with one
The first test was a notification copy change. It was small, it was boring, and it lost. We read the result out on Friday with the loser's name on it, which was mine. That Friday reading became the most important meeting in the company.
The template
One page. A hypothesis in one sentence, the metric, the sample size we needed, the date we would decide. Anyone could fill it in; most weeks the engineer who built the feature did.
The rules
- Every test gets a written decision, even a boring one
- A test with no sample size is not a test
- Losers are read out with the same voice as winners
Forty a quarter
By the end of the year the template was a habit and the Friday reading had a waiting list. Forty tests a quarter sounds like a lot; it is three a week, most of them small.
A test you do not write down is a story you tell later, and the story is always better than the test.
What changed
Half of what we were sure about turned out to be wrong. That is not a sad number. It is the number of arguments we stopped having.
Experimentation
Forty tests a quarter
How a small team learned to ship experiments without a growth team.
Published Jun 2, 20262 min readExperimentation

When I joined Relay we shipped every week and tested nothing. When I left we ran forty experiments a quarter. This is how a team of nine got there without a growth team.
Start with one
The first test was a notification copy change. It was small, it was boring, and it lost. We read the result out on Friday with the loser's name on it, which was mine. That Friday reading became the most important meeting in the company.
The template
One page. A hypothesis in one sentence, the metric, the sample size we needed, the date we would decide. Anyone could fill it in; most weeks the engineer who built the feature did.
The rules
- Every test gets a written decision, even a boring one
- A test with no sample size is not a test
- Losers are read out with the same voice as winners
Forty a quarter
By the end of the year the template was a habit and the Friday reading had a waiting list. Forty tests a quarter sounds like a lot; it is three a week, most of them small.
A test you do not write down is a story you tell later, and the story is always better than the test.
What changed
Half of what we were sure about turned out to be wrong. That is not a sad number. It is the number of arguments we stopped having.
Experimentation
Forty tests a quarter
How a small team learned to ship experiments without a growth team.
Published Jun 2, 20262 min readExperimentation

When I joined Relay we shipped every week and tested nothing. When I left we ran forty experiments a quarter. This is how a team of nine got there without a growth team.
Start with one
The first test was a notification copy change. It was small, it was boring, and it lost. We read the result out on Friday with the loser's name on it, which was mine. That Friday reading became the most important meeting in the company.
The template
One page. A hypothesis in one sentence, the metric, the sample size we needed, the date we would decide. Anyone could fill it in; most weeks the engineer who built the feature did.
The rules
- Every test gets a written decision, even a boring one
- A test with no sample size is not a test
- Losers are read out with the same voice as winners
Forty a quarter
By the end of the year the template was a habit and the Friday reading had a waiting list. Forty tests a quarter sounds like a lot; it is three a week, most of them small.
A test you do not write down is a story you tell later, and the story is always better than the test.
What changed
Half of what we were sure about turned out to be wrong. That is not a sad number. It is the number of arguments we stopped having.

Let's talk
Send the role. I will read it.
Send the role. I will read it.A short mail is enough: the team, the problem, the stage. I answer every one, and I say no quickly when it is a no.
Open to work from January 2027

Let's talk
Send the role. I will read it.
Send the role. I will read it.A short mail is enough: the team, the problem, the stage. I answer every one, and I say no quickly when it is a no.
Open to work from January 2027

Let's talk
Send the role. I will read it.
Send the role. I will read it.A short mail is enough: the team, the problem, the stage. I answer every one, and I say no quickly when it is a no.
Open to work from January 2027