Iris Vale
Iris Vale
Product manager
Relay
Relay experiments
The first experimentation program: a test a week, then forty a quarter.
- Year
- 2020
- Tags
- ExperimentationProcess

Relay was shipping every week but nobody knew which of the shipped things worked. I set up the experimentation program on the side of the app work.
The setup
- One test a week at first, run by whoever shipped the feature
- A one-page template: hypothesis, metric, sample, decision
- A Friday reading where results were read out, including the losers
The number
Forty tests a quarter by the end of the year, and a written decision for every one of them.
A test you do not write down is a story you tell later.
What it taught me
Half of what we were sure about was wrong. The other half we could now prove.
How it ran
The program had no budget and no headcount, so it had to be cheap. The flag system was a config file, the sample-size calculator was a spreadsheet, and the reading was twenty minutes on a Friday with coffee. The engineers ran their own tests because the template was short enough to fill in while the build was running. By the second quarter people were asking to be on the Friday list, and by the third the product decisions in the planning meeting came with a test number attached.
Relay
Relay experiments
The first experimentation program: a test a week, then forty a quarter.
- Year
- 2020
- Tags
- ExperimentationProcess

Relay was shipping every week but nobody knew which of the shipped things worked. I set up the experimentation program on the side of the app work.
The setup
- One test a week at first, run by whoever shipped the feature
- A one-page template: hypothesis, metric, sample, decision
- A Friday reading where results were read out, including the losers
The number
Forty tests a quarter by the end of the year, and a written decision for every one of them.
A test you do not write down is a story you tell later.
What it taught me
Half of what we were sure about was wrong. The other half we could now prove.
How it ran
The program had no budget and no headcount, so it had to be cheap. The flag system was a config file, the sample-size calculator was a spreadsheet, and the reading was twenty minutes on a Friday with coffee. The engineers ran their own tests because the template was short enough to fill in while the build was running. By the second quarter people were asking to be on the Friday list, and by the third the product decisions in the planning meeting came with a test number attached.
Relay
Relay experiments
The first experimentation program: a test a week, then forty a quarter.
- Year
- 2020
- Tags
- ExperimentationProcess

Relay was shipping every week but nobody knew which of the shipped things worked. I set up the experimentation program on the side of the app work.
The setup
- One test a week at first, run by whoever shipped the feature
- A one-page template: hypothesis, metric, sample, decision
- A Friday reading where results were read out, including the losers
The number
Forty tests a quarter by the end of the year, and a written decision for every one of them.
A test you do not write down is a story you tell later.
What it taught me
Half of what we were sure about was wrong. The other half we could now prove.
How it ran
The program had no budget and no headcount, so it had to be cheap. The flag system was a config file, the sample-size calculator was a spreadsheet, and the reading was twenty minutes on a Friday with coffee. The engineers ran their own tests because the template was short enough to fill in while the build was running. By the second quarter people were asking to be on the Friday list, and by the third the product decisions in the planning meeting came with a test number attached.

Let's talk
Send the role. I will read it.
Send the role. I will read it.A short mail is enough: the team, the problem, the stage. I answer every one, and I say no quickly when it is a no.
Open to work from January 2027

Let's talk
Send the role. I will read it.
Send the role. I will read it.A short mail is enough: the team, the problem, the stage. I answer every one, and I say no quickly when it is a no.
Open to work from January 2027

Let's talk
Send the role. I will read it.
Send the role. I will read it.A short mail is enough: the team, the problem, the stage. I answer every one, and I say no quickly when it is a no.
Open to work from January 2027