Skip to content
Skip to content
Skip to content

Relay

The first experimentation program: a test a week, then forty a quarter.

Product managerRelay
Year
2020
Tags
ExperimentationProcess
A studio with screens and a mood wall
The number it moved tests a quarter

Relay was shipping every week but nobody knew which of the shipped things worked. I set up the experimentation program on the side of the app work.

The setup

  • One test a week at first, run by whoever shipped the feature
  • A one-page template: hypothesis, metric, sample, decision
  • A Friday reading where results were read out, including the losers

The number

Forty tests a quarter by the end of the year, and a written decision for every one of them.

A test you do not write down is a story you tell later.

What it taught me

Half of what we were sure about was wrong. The other half we could now prove.

How it ran

The program had no budget and no headcount, so it had to be cheap. The flag system was a config file, the sample-size calculator was a spreadsheet, and the reading was twenty minutes on a Friday with coffee. The engineers ran their own tests because the template was short enough to fill in while the build was running. By the second quarter people were asking to be on the Friday list, and by the third the product decisions in the planning meeting came with a test number attached.

Next project2016Mast design systemOne component library for three client products, with the pricing pages first.

Relay

The first experimentation program: a test a week, then forty a quarter.

Product managerRelay
Year
2020
Tags
ExperimentationProcess
A studio with screens and a mood wall
The number it moved tests a quarter

Relay was shipping every week but nobody knew which of the shipped things worked. I set up the experimentation program on the side of the app work.

The setup

  • One test a week at first, run by whoever shipped the feature
  • A one-page template: hypothesis, metric, sample, decision
  • A Friday reading where results were read out, including the losers

The number

Forty tests a quarter by the end of the year, and a written decision for every one of them.

A test you do not write down is a story you tell later.

What it taught me

Half of what we were sure about was wrong. The other half we could now prove.

How it ran

The program had no budget and no headcount, so it had to be cheap. The flag system was a config file, the sample-size calculator was a spreadsheet, and the reading was twenty minutes on a Friday with coffee. The engineers ran their own tests because the template was short enough to fill in while the build was running. By the second quarter people were asking to be on the Friday list, and by the third the product decisions in the planning meeting came with a test number attached.

Next project2016Mast design systemOne component library for three client products, with the pricing pages first.

Relay

The first experimentation program: a test a week, then forty a quarter.

Product managerRelay
Year
2020
Tags
ExperimentationProcess
A studio with screens and a mood wall
The number it moved tests a quarter

Relay was shipping every week but nobody knew which of the shipped things worked. I set up the experimentation program on the side of the app work.

The setup

  • One test a week at first, run by whoever shipped the feature
  • A one-page template: hypothesis, metric, sample, decision
  • A Friday reading where results were read out, including the losers

The number

Forty tests a quarter by the end of the year, and a written decision for every one of them.

A test you do not write down is a story you tell later.

What it taught me

Half of what we were sure about was wrong. The other half we could now prove.

How it ran

The program had no budget and no headcount, so it had to be cheap. The flag system was a config file, the sample-size calculator was a spreadsheet, and the reading was twenty minutes on a Friday with coffee. The engineers ran their own tests because the template was short enough to fill in while the build was running. By the second quarter people were asking to be on the Friday list, and by the third the product decisions in the planning meeting came with a test number attached.

Next project2016Mast design systemOne component library for three client products, with the pricing pages first.
A studio table in daylight

Let's talk

Send the role. I will read it.

A short mail is enough: the team, the problem, the stage. I answer every one, and I say no quickly when it is a no.

Open to work from January 2027

I answer within two daysContact page
A studio table in daylight

Let's talk

Send the role. I will read it.

A short mail is enough: the team, the problem, the stage. I answer every one, and I say no quickly when it is a no.

Open to work from January 2027

I answer within two daysContact page
A studio table in daylight

Let's talk

Send the role. I will read it.

A short mail is enough: the team, the problem, the stage. I answer every one, and I say no quickly when it is a no.

Open to work from January 2027

I answer within two daysContact page

Product manager

Right now

Open to work from January 2027

Berlin--:--local time

Product manager

Right now

Open to work from January 2027

Berlin--:--local time

Product manager

Right now

Open to work from January 2027

Berlin--:--local time

Create a free website with Framer, the website builder loved by startups, designers and agencies.